Bridgewood Green

Job status: In progress

Number of units

126

Name of project

Bridgewood Green

CLIENT

Miller Homes

LOCATION

Collingham

OUTLINE OF WORKS

Bridgewood Green is sheltered by mature trees lining the banks of Collingham Beck so we installed sophisticated sustainable drainage (SuDS) and deep drainage systems
to manage water runoff.

S278 interface with the A58 (Leeds Road) to create safe, engineered site entrances and internal road networks.

Gallery