The Pastures

Job status: In progress

Number of units

62

Name of project

The Pastures

CLIENT

Banks Homes

LOCATION

Hambleton

OUTLINE OF WORKS

Groundworks phase began in late 2025, first establishing the main access road from Gateforth Lane. We prepared the 2.6-hectare site by leveling the ground for the 62 initial plots, ranging from 2-bedroom bungalows to 5-bedroom houses.

Sustainable Drainage (SuDS) includes an urban drainage pond to manage surface water—a key requirement for the Hambleton site to ensure no increased flood risk to the surrounding village.

 

Gallery